Functional Safety Certification for Autonomous Trains and Metros: EN 50128 Explained

Date
2027-03-25
Location
Online
Host
Zach L
Register

About this event

Functional Safety Certification for Autonomous Trains and Metros: EN 50128 Explained is scheduled for Thursday, March 25, 2027 at 10:00 AM (America/Los_Angeles).

The recorded topics connect this subject with functional safety assessment; Full-Day Training; R&D Teams; safety lifecycle; compliance evidence; SIL; risk assessment; safety case Critical Systems Analysis provides embedded functional safety consulting for EN 50128. Learn more: [https://criticalsystemsanalysis.com](https://criticalsystemsanalysis.com) Partner with us: [https://meetings.hubspot.com/benjamin-twombly/strategic-partnerships](https://meetings.hubspot.com/benjamin-twombly/strategic-partnerships).

Partner with us: https://meetings.hubspot.com/benjamin-twombly/strategic-partnerships

Topics

About EN 50128 (Railway Software)

This training provides practical skills and structured learning on the compliance requirements covered by EN 50128.

EN 50128 specifies software development for railway control and protection: SIL 0-4 graded techniques for lifecycle phases, roles with required independence, and evidence for software used in signaling and train control.

What it regulates

Organization and roles (designer, verifier, validator, assessor independence), technique tables per SIL, tool classes T1-T3, and software validation/assessment for rail.

Who must comply

Signaling suppliers (interlockings, ETCS), rolling stock software teams (with EN 50657 for on-board), and independent assessors.

Key requirements of EN 50128

  • Role independence matrix by SIL
  • Annex A technique tables
  • Data preparation processes for configuration-driven systems
  • Deployment and maintenance requirements

Key concepts: EN 50128

Data-driven safety
Site data (track layouts) treated with its own prepared, verified lifecycle.
Software SIL
Rail's software integrity grading including SIL 0 for non-safety rail software under the same framework.
Independent assessor
Mandatory third-party software assessment at higher SILs.

Frequently asked questions: EN 50128

What replaced EN 50128 for rolling stock?

EN 50657 carved out on-board rolling stock software; 50128 continues for signaling/control-command. Requirements philosophy is shared, scopes differ.

Standard information based on the published text of EN 50128 (Railway Software). Event content is provided by the host. For authoritative guidance, consult the official standard body.